SCUP
 

Learning Resources

Your Higher Education Planning Library

Combine search terms, filters, institution names, and tags to find the vital resources to help you and your team tackle today’s challenges and plan for the future. Get started below, or learn how the library works.

FOUND 91 RESOURCES

REFINED BY:

  • Tags: RenovationxCapital Planningx

Clear All
ABSTRACT:  | 
SORT BY:  | 
Conference Presentations

Published
March 8, 2019

2019 North Atlantic Regional Conference | March 2019

Expanding Residential Accommodation With Limited New Construction

Come learn how a 2016 housing planning study that started with an inventory analysis quickly evolved into an ongoing program to add 100+ beds per year beginning in 2017.
Abstract: New dorm construction takes time and funding that often competes with the ongoing need to upgrade existing dorms. Despite limited resources, campus planning and capital programs teams are successfully doing both. Tufts University's first housing program since the 1970s is transforming the undergraduate residential experience two-fold: by rapidly increasing the on-campus bed supply in existing facilities and by renewing residential buildings. Come learn how a 2016 housing planning study that started with an inventory analysis quickly evolved into an ongoing program to add 100+ beds per year beginning in 2017.

Member Price:
Free

Non-Member Price:
Free

Conference Presentations

Published
March 8, 2019

2019 North Atlantic Regional Conference | March 2019

ASAP

CUNY’s Path to Improving Degree Completion

In this session, you will learn about CUNY's ASAP model, how it receives operating and capital funding, and how the physical spaces that support the program were identified, designed, and renovated.
Abstract: The City University of New York's (CUNY) Accelerated Study in Associate Programs (ASAP) assists students in earning associate degrees within three years by providing a comprehensive range of financial, academic, and personal supports. Completion rates at community colleges remain extremely low; however, CUNY's ASAP students earned their associate degrees at substantially higher rates than non-ASAP students, even when a longer timeframe was considered. In this session, you will learn about CUNY's ASAP model, how it receives operating and capital funding, and how the physical spaces that support the program were identified, designed, and renovated.

Member Price:
Free

Non-Member Price:
Free

Conference Presentations

Published
March 8, 2019

2019 North Atlantic Regional Conference | March 2019

Repurposing Mid-Century Campus Buildings for a New Generation

In this session, we will explore how Binghamton University implemented a façade upgrade and high performance energy systems for deep energy retrofits for its Science IV building.
Abstract: Many college campus buildings were built in time of cheap, fossil fuel-based energy, making them now costly to operate and maintain and giving them a high carbon footprint. In this session, we will explore how Binghamton University implemented a façade upgrade and high performance energy systems for deep energy retrofits for its Science IV building. Come learn how you can use smart technologies and modest materials applied in creative ways to update similar building stock at your institution.

Member Price:
Free

Non-Member Price:
Free

Planning for Higher Education Journal

Published
October 1, 2018

Featured Image

Change and Renewal for Existing Campus Libraries

Successful Strategies and Lessons Learned

Renovating an existing academic library to meet 21st-century needs requires rethinking both its program and design to create a vibrant, welcoming campus hub for all.

From Volume 47 Number 1 | October–December 2018

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
October 1, 2018

Featured Image

Out of the Shadows

Science and Technology Buildings Emerge as Campus Experience Hubs

To prepare students for 21st-century careers, recent capital investments are placing science and technology at the center of campus, with new facilities designed as both social and learning spaces.

From Volume 47 Number 1 | October–December 2018

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
July 1, 2018

Featured Image

Designing and Building Your Capital Project

Choosing the Method That’s Right for You

The first step in building your capital project is choosing the delivery method that best meets your institution’s needs and the project’s unique goals.

From Volume 46 Number 4 | July–September 2018

Abstract: Capital projects are designed and built in a number of ways. Each has its strengths and weaknesses, and each prescribes different roles for the owner, architect, and builder. The question is, which way or method best fits your institution’s criteria and project? This article presents a brief outline of the most popular methods by which projects are designed and built.

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
April 1, 2018

Featured Image

Campus Renewal

Working With What You’ve Got

Through a holistic approach emphasizing selective revitalization and limited new construction, Laurentian University transformed its facilities to significantly enhance the student experience.

From Volume 46 Number 3 | April–June 2018

Abstract: A mid-century campus confronted issues of aging infrastructure and tectonic shifts in pedagogy by implementing a comprehensive modernization plan focused on enhancing the student experience. Working with a limited budget, Laurentian University managed to transform its facilities through selective revitalization of nine buildings and some discerning construction to create a new identity, greater connectivity, and a new campus heart to support student interaction and engagement. The creative impetus stemmed from a holistic approach to rejuvenation rather than straightforward expansion—of choosing to build in, not out. This architectural response will enable the university to plan for the next 50 years with consistency and design continuity.

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
January 1, 2018

Featured Image

Design-Build Delivers Added Value to the University of North Georgia

Design-build delivery helps higher education institutions control costs, streamline processes and communications, and more efficiently and effectively meet project objectives.

From Volume 46 Number 2 | January–March 2018

Abstract: The design-build delivery approach, in which design and construction services are contracted through a single entity, has the potential to help higher education institutions control costs, streamline processes and communications, and more efficiently and effectively meet project objectives. This article examines the relationship between the University of North Georgia and design-build firm Pond, describing the process of design-build and highlighting two projects, the replacement of a dining hall floor and the renovation of a science classroom. The success of these projects demonstrates the benefits of integration and collaboration inherent in the design-build model.

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
January 1, 2018

Featured Image

Nurturing Your Capital Project

The Path from Concept to Ribbon Cutting

By following the progression of steps needed to complete a typical capital improvement project detailed here, even the most complex project can be accomplished effectively and efficiently.

From Volume 46 Number 2 | January–March 2018

Abstract: In this second of a two-part series, the author details the progression of steps needed to complete a typical capital improvement project. There are a lot of moving parts, and the article carefully explains how each must mesh to achieve a satisfactory conclusion. Educators and administrators alike will benefit from this overview of procedures that many may not be familiar with. With this guidance, even the most complex project can be accomplished effectively and efficiently.

Member Price:
Free  | Login

Member-only Resource

Join now to have access