SCUP
 

Learning Resources

Your Higher Education Planning Library

Combine search terms, filters, institution names, and tags to find the vital resources to help you and your team tackle today’s challenges and plan for the future. Get started below, or learn how the library works.

FOUND 4 RESOURCES

REFINED BY:

  • Format: Planning for Higher Education Journalx
  • Tags: Project Management / Deliveryx

Clear All
ABSTRACT:  | 
SORT BY:  | 
Planning for Higher Education Journal

Published
November 21, 2023

Featured Image

Overcoming a $90M Budget Overage in Vanderbilt University’s Residential Colleges

A Multifaceted Team Worked Collaboratively to Stem Overruns

The University, architects, engineers, strategic planning consultants, and contractor teams worked hand in hand to peel back the onion to stem the overruns.

From Volume 52 Number 1 | October–December 2023

Abstract: When Vanderbilt University began seeing signs that cost escalation, scope additions, campus requirements, and authentic Collegiate Gothic architecture for their proposed new residence halls were all pressuring the budget, a multifaceted team worked collaboratively and arduously to stem the overruns.

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
July 1, 2018

Featured Image

Designing and Building Your Capital Project

Choosing the Method That’s Right for You

The first step in building your capital project is choosing the delivery method that best meets your institution’s needs and the project’s unique goals.

From Volume 46 Number 4 | July–September 2018

Abstract: Capital projects are designed and built in a number of ways. Each has its strengths and weaknesses, and each prescribes different roles for the owner, architect, and builder. The question is, which way or method best fits your institution’s criteria and project? This article presents a brief outline of the most popular methods by which projects are designed and built.

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
January 1, 2018

Featured Image

Design-Build Delivers Added Value to the University of North Georgia

Design-build delivery helps higher education institutions control costs, streamline processes and communications, and more efficiently and effectively meet project objectives.

From Volume 46 Number 2 | January–March 2018

Abstract: The design-build delivery approach, in which design and construction services are contracted through a single entity, has the potential to help higher education institutions control costs, streamline processes and communications, and more efficiently and effectively meet project objectives. This article examines the relationship between the University of North Georgia and design-build firm Pond, describing the process of design-build and highlighting two projects, the replacement of a dining hall floor and the renovation of a science classroom. The success of these projects demonstrates the benefits of integration and collaboration inherent in the design-build model.

Member Price:
Free  | Login

Member-only Resource

Join now to have access

Planning for Higher Education Journal

Published
October 1, 2016

Featured Image

Integrated Project Planning in a Construction Management Environment

The College of DuPage’s Naperville, Illinois, Satellite Campus

When the whole team knows the “why” behind the planning and design process, the result is a better “what.”

From Volume 45 Number 1 | October–December 2016

Abstract: The College of DuPage (COD) is a two-year community college located in Glen Ellyn, Illinois. COD leaders and administrators believe that the whole team’s understanding of the “why” behind the planning and design process is vital to ensuring the achievement of a higher-quality “what” after construction. Employing an integrated project team approach by adding a construction management group to the design and facilities team, COD completed $550 million in capital projects from 2001 to 2014. The final element of COD’s most recent master plan was the development of a prototype renovation for its four satellite campuses. The goal of the prototype was to elevate the classroom experience to state-of-the-art instructional and educational standards, improve the energy performance of the facilities, and offer the same services provided at the main campus. The overarching challenge was for the planners, facilities staff, and construction managers to work together to fit a large campus educational program into a single-building prototype.

Member Price:
Free  | Login

Member-only Resource

Join now to have access