Planning for Higher Education Journal

Published
October 1, 2019

Featured Image

Phased Transformations of Academic Buildings

Can’t vacate the facility? Renovation in stages can be planned efficiently.

When you’re renovating a campus building, you’re contending with dust, noise, vibration, the risk of budget overruns, relocating occupants, extended timelines, and more. Following best practices of experienced planners can help you to mitigate the most common challenges.

From Volume 48 Number 1 | October–December 2019

Abstract: As mid-20th-century buildings reach the end of their service life, academic institutions are confronted by the challenge of renovating them while they remain partially occupied. When appropriate swing space is unavailable, or when there is no potential for vacating a building completely to allow renovation to occur more efficiently, a phased approach becomes necessary. The consequences of committing to phased renovation, however, are not only logistical, but also financial, programmatic, and technical. Through analysis of phased renovation projects across multiple building types, one can extract best practices for planning, design, and construction to mitigate many of the most common challenges.

Member Price:
Free

Non-Member Price:
Free

Conference Presentations

Published
July 14, 2019

2019 Annual Conference | July 2019

A Survival Guide to Planning and Executing Phased Renovations

Abstract: Renovating campus buildings that are partially occupied is a frequent challenge. Planning and executing an efficient phased renovation optimizes resource use and minimizes disruption. This presentation will focus on lessons learned in three case studies of phased renovations, comprising mid-20th century science and humanities buildings as well as student housing. You will learn about best practices from projects across multiple building types as well as examine planning methodologies, design processes, and technical challenges for broader applicability.

Member Price:
Free

Non-Member Price:
Free

Planning for Higher Education Journal

Published
July 1, 2019

Another Day Older, Another Day Better

Institutions Are Infusing New Life Into Mid-Century Campus Buildings

While they might be historical gems, are mid-century campus buildings still structurally sound? Is their location and architecture meaningful to the institution? What about energy efficient and fiscally responsible? College and university leaders must make the call: to fix or not to fix.

From Volume 47 Number 4 | July–September 2019

Abstract: Replace, restore, or renovate? In this article, architects, engineers, and campus administrators offer insights on updating mid-century buildings. Averaging a half-century old, these once-innovative structures are showing signs of age. The author gives guidance on transforming them into buildings that make positive contributions to the 21st-century campus. Topics covered include how to assess a building’s potential for renovation, options for energy-efficient HVAC systems, choosing materials that enhance the building’s performance and reduce operating costs, updating 50-year-old floor plans to support today’s pedagogy, and funding models and sources for projects.